Built on the standards your submittals cite
Send all hardware data before production. List lock, hinge, closer, and wire pass details on the door schedule, confirm cutout margins, and approve shop drawings and samples so hotel doors arrive machined for smart locks, not site carpentry.
Keep existing welded steel frames when the opening can support a compatible replacement wood door. Get a measuring matrix and floor-by-floor checklist for machining, finish matching, mockups, and a phased rollout in an operating hotel during a renovation.
Weigh overseas factory-direct and U.S. domestic wood door bids for a hotel with 100 or more rooms. Price complete openings on one scope, add freight, duties, and spares, then test first-batch dates, veneer sample speed, and warranty support.
Compare STC 32, 35, 40, and 45 for hotel guestroom doors. See what guests may hear through each assembly, how cores and seals affect performance, and when to specify higher ratings for suites, connecting rooms, and meeting spaces.
Build a fire-rated wood door budget for a 150-room U.S. hotel. Use the door schedule to estimate costs for leaves, frames, and hardware, then compare factory-direct and local quotes on the same scope, accounting for freight and installation.