Built on the standards your submittals cite
Send all hardware data before production. List lock, hinge, closer, and wire pass details on the door schedule, confirm cutout margins, and approve shop drawings and samples so hotel doors arrive machined for smart locks, not site carpentry.
Keep existing welded steel frames when the opening can support a compatible replacement wood door. Get a measuring matrix and floor-by-floor checklist for machining, finish matching, mockups, and a phased rollout in an operating hotel during a renovation.