Markets
Offices & Public Spaces
UL 10C fire-rated openings, 20–90 minutes, built for code corridors and daily traffic.
One schedule covers both — veneer at reception, Extra Heavy Duty in the corridors.

Offices & Public Spaces
A door leads two lives: design element at the front, workhorse at the back
One schedule covers both — veneer at reception, Extra Heavy Duty in the corridors.
STC 32–42 with the CS sound core where rooms have to close; Extra Heavy Duty SCL where the traffic never stops — specified from one door schedule, delivered by one supplier.
Compliance documentation issued with the submittal package.
What Project Teams Live With
Front of house and back of house are two standards
Reception wants veneer and design language; service corridors want doors that shrug off carts and daily abuse. Few suppliers are professional at both.
The meeting room has a hole in the wall
A partition built to STC 50 with an STC 30 door is an STC 30 room — and in the open-plan era, a room you can close is worth more than ever.
High frequency is slow demolition
An airport or rail-station door can cycle a thousand times a day; corridors and stairwells, a few hundred. Loose hardware and worn faces become a permanent line in the operations budget.
Built for Both Lives
-
Any design the project speaks
Veneer, paint, HPDL, custom geometry — the design brief is open. What never changes underneath: the fire rating, the STC, the duty level.
-
Meeting rooms: seal the room
CS series — Composite Sound Core, STC 32–42 — brings the door to the same order as the wall.
CS series cutsheet → -
Corridors: SCL, no shortcuts
High-frequency circulation is SCL's home ground — Extra Heavy Duty under ANSI/WDMA I.S.1-A, no hardware blocking needed.
-
Credentials your procurement asks for
FSC-certified sourcing, CARB Phase 2 / TSCA Title VI compliance, LEED contribution documented.
FB-LEED-2026 →

Sourcing, emissions, and duty-level evidence issued with the submittal package.
Additional references available upon request.

