Project Case Study
Gates Foundation Beijing Office
Extra-tall acoustic leaves sized to the glass partitions, not to a standard opening.

Project Overview
The partitions set the door height,
so the doors were built to it.
The Beijing office runs floor-to-ceiling glass partitions through the workspace, which leaves a standard door looking like a compromise the moment it is hung — a transom panel above the leaf to make up the height, and an acoustic weak point exactly where the seal matters.
Forest Bright engineered extra-tall wood acoustic leaves sized to the glazed partition height instead, finished in a light veneer with coordinating gray steel frames. Hardware was specified for quiet, precise closure rather than for the door’s weight alone.
Our technical team carried the project from the initial site take-off through the door schedule and hardware detailing to installation on site — the sequence that matters when leaf dimensions are driven by partition setting-out rather than by an opening schedule.
Scope of Supply
Forest Bright Supplied:
- Extra-tall wood acoustic doors — sized to pair with the floor-to-ceiling glass partitions
- Light wood veneer finish — with coordinating gray steel door frames
- Engineered hardware — hinges, lever locksets and floor-mounted door stops, fitted for precise, quiet closure
- Full technical support — from on-site take-off through door schedule and solution design to installation
On the floor


