Project Case Study
King Khalid International Airport
122 90-minute fire door leaves, cut to frames already in the building.

Project Overview
Leaves only. Everything else
was already there.
A terminal renovation at King Khalid International Airport called for 122 90-minute fire-rated door leaves — and nothing else. The hollow metal frames and hardware stayed in place, which meant every leaf had to arrive matching hinge and hardware cutouts that were measured, not specified, and that no drawing could be re-issued to correct.
Forest Bright manufactured all 122 HPL flush leaves to those existing conditions. To match the finish and grain of the doors already in the terminal, the HPL board was sourced from a Turkish mill rather than substituted with a close-enough alternative. Every leaf hung against its existing frame without on-site frame rework.
Scope of Supply
Forest Bright Supplied:
- 122 — of 90-minute fire-rated HPL flush door leaves, matched to the existing hollow metal frames
- Turkish-sourced HPL board — imported to match the finish and grain of the original doors
- Leaf-only replacement scope — precision-fit to the existing steel frames' hinge and hardware cutouts, with no on-site frame rework