Project Case Study

Sheraton North Houston

Precision-matched doors for a four-decade-old Houston landmark — a different colour on every floor.

Houston, Texas Hotels & Hospitality Completed 2023
Sheraton North Houston

Project Overview

New leaves into 1983 frames,
with zero frame replacement.

Built in 1983 and renovated several times since, the Sheraton North Houston at George Bush Intercontinental needed 225 entry doors and 227 sliding doors replaced across its guest floors — without disturbing the existing steel frames or the hardware being retained. Every new leaf had to interface with hardware positions and tolerances set four decades earlier.

Designers specified a different door colour per floor, which made packing and labelling as critical as the doors themselves: installers had to be able to match each door to its designated floor without opening crates to check. Doors were finished in Sherwin-Williams SW 7657 Tinsmith, labelled by floor, and fitted precisely within the original frame conditions.

Scope of Supply

Forest Bright Supplied:

  • 225 sets — of 20-minute fire-rated paint-grade flush entry doors, finished in Sherwin-Williams SW 7657 Tinsmith
  • 227 sets — of paint-grade sliding barn doors with groove detail, matched to the same SW 7657 Tinsmith finish
  • Entry door hardware — door viewers, spring hinges and standard hinges, fitted to the existing steel frames
  • Sliding door hardware — barn door track systems and pulls
Project Facts
Industry Hotels & Hospitality
Location 15700 John F Kennedy Blvd, Houston, TX 77032
Doors Supplied 452
Completed 2023