Project Case Study

Kings Wharf Tower E

274 entry doors machined to hinge and strike preparations set by someone else's frames.

Dartmouth, Nova Scotia Multi-Family Completed 2025
Kings Wharf Tower E

Project Overview

We didn’t supply the frames.
The doors still fit them.

The defining constraint on this new-build project was that the hollow metal frames were sourced locally by the client, not by us — so every hinge and strike position was fixed before our doors were made, and any deviation would have surfaced as site rework across 274 units.

Forest Bright supplied 274 unit entry door systems, leaves and hardware packages, each leaf fully factory-machined to match the frame hinge and strike locations. Doors aligned with the existing preparations on arrival, keeping on-site rework to a minimum and the installation sequence intact.

Scope of Supply

Forest Bright Supplied:

  • 274 sets — of 20-minute fire-rated HPDL entry doors, factory-prepped for hinge and lock set preparations
  • Complete hardware package — hinges, closers, door guards, viewers, smoke seals, bottom seals, door stops
Project Facts
Industry Multi-Family
Location Dartmouth, NS B2Y 0B4, Canada
Doors Supplied 274
Completed 2025