Project Case Study
Hilton Garden Inn Clackamas Portland
433 openings into the original steel frames — no frame alterations, no on-site rework.

Project Overview
Leaves and hardware only.
The frames stayed put.
This 2025 renovation replaced guest room and bathroom door leaves and hardware while retaining every existing steel frame — which puts the entire tolerance burden on the manufacturer, since a leaf that misses the frame by a few millimeters means either site rework or a frame nobody budgeted to replace.
Forest Bright delivered three opening types across the property: 210 20-minute fire-rated entry doors, 210 non-rated bathroom doors, and 13 pairs of 45-minute fire-rated connecting doors. Each leaf was manufactured to the existing frame condition and finished in Wilsonart Daintree 8235 PLAM for one consistent surface throughout.
Entry doors were fitted with viewers, hinges, closers, privacy latches, and smoke gasketing to preserve the original fire rating; bathroom doors with hinges, privacy lever sets, and wall stops in the same finish. The installation completed with all original frames in place and no on-site rework.
Scope of Supply
Forest Bright Supplied:
- 210 leaves — of 20-minute fire-rated flush entry doors, finished in Wilsonart Daintree 8235 PLAM
- 210 leaves — of non-rated bathroom doors, same Wilsonart Daintree 8235 PLAM finish
- 13 pairs — of 45-minute fire-rated connecting doors, same finish
- Entry door hardware — viewers, hinges, closers, privacy latches, smoke gasketing, fitted to the existing steel frames
- Bathroom door hardware — hinges, privacy lever locks, wall stops