Project Case Study

AC Hotel RiNo

Doors, adjustable steel frames and matching wall panels — produced concurrently to hold a compressed schedule.

Denver, Colorado Hotels & Hospitality Completed 2025
AC Hotel RiNo

Project Overview

The drawings ran late.
The doors didn’t.

Forest Bright supplied complete door systems — leaf, frame and hardware — for all 128 guest room openings, to the same specification and the same finish quality on every floor. Design review had absorbed much of the schedule without moving the installation date, so HPL colors were confirmed and stock staged before the drawings were released, then doors, frames and panels ran in concurrent production with each leaf pre-machined for its hardware. Every opening was delivered on schedule.

Scope of Supply

Forest Bright Supplied:

  • 128 sets of 20 - minute fire-rated HPL entry doors, pre-machined for the full hardware set
  • Custom adjustable steel frames — supplementary screw holes for stability and precise alignment on site
  • Matching wall panels — French cleat mounting system for fast, flush installation
  • Complete hardware package — hinges, closers, door guards, viewers, smoke seals, kick plates, bottom seals, door stops, in one stainless steel finish
Project Facts
Industry Hotels & Hospitality
Location 3680 N Brighton Blvd, Denver, CO 80216
Doors Supplied 128
Completed 2025